APPLY TO CORPORATION

WE WILL CALL YOU BACK

CAPTCHA

Have you got an idea for a new project? Apply for production location →

JSC " KALININGRAD REGION DEVELOPMENT CORPORATION" SIGNED A CONTRACT FOR THE PERFORMANCE OF CONSTRUCTION AND INSTALLATION WORKS

news-bg.jpg
The number of residents of the industrial park "Khrabrovo" is growing every year, in connection with this, JSC " Kaliningrad Region Development Corporation" has planned to modernize the water supply system.

Kaliningrad Region Development Corporation JSC and GazTeploMontazh LLC signed an agreement for construction and installation work on the project: "Engineering infrastructure of the Khrabrovo industrial park, consisting of: water supply network" in the Zelenogradsky district of the Kaliningrad region. Stage I ".

The total length of the water supply networks is 4.5 km.

The competitive procedures allowed not only to reduce the cost of work to 12.5 million rubles, with an initial 14.3 million rubles (saving 12.6%), but also to reduce the execution time to 70 days, with an initial 114 (a decrease of 39%).
The projected water pipeline route begins in the area of TP-1/2 and further along the existing automobile road of the industrial park "Khrabrovo" with branches to land plots for the subsequent connection of consumers located on these sites to water supply networks, and ends at the border of the storage unit with cadastral number 39: 05: 051213: 245.

The water pipeline route through the construction site is determined by the terms of reference and the scheme of the engineering infrastructure of the industrial park "Khrabrovo", consisting of: a water supply network and utility sewerage (stage I), rainwater drainage system (stage II) and a road (stage II) in Zelenogradsky district of the Kaliningrad region.

Up ↑